News from ematec

you can find here

to the news overview

Newsletter 04/2009

Shuttle vehicle with carriageway commissioned

Our task: 
Transport material in a glass tunnel connecting two production halls.
 

   


Our solution:
Build a shuttle with a 80m carriageway, integrated in the the connecting building.

   

The installation now supports the internal flow of material of Thöni Industriebetriebe in Telfs.


more news

We find a suitable solution
for every problem

Our competences
Hoisting technology
Industrial handling
Automation engineering
Material flow
Production resources