News from ematec

you can find here

to the news overview

Newsletter 05/2010

A strong team of helpers

Developed especially for the assembly and erection of crawler cranes.
An assembly boom and a reeving winch to be mounted to the Liebherr TL442-13 Telescopic Loader. Both auxiliary units are equipped with a mounting plate for a quick mechanical change. The assembly boom is swivel-mounted at the carrier frame, while the cable winch is mounted permanently on the carrier frame, with a canopy and protective covering on three sides. The winch is controlled and powered by the lift truck hydraulics. It is used for the reeving of the crawler crane load cable. The assembly boom is used for handling the pin-pulling cylinders during crane erection and disassembly. The boom has a length of 3 m and can take loads of up to 100 kg. The integrated hand cable winch has an effective cable length of 7 m.
The ideal supplement to this is our BZGF9-Silent hydraulic unit - it supplies the necessary power for pin-pulling and assembly whenever and wherever needed.
The forth member of our strong team of helpers is the TDA 45 crane erection dolly. It is used to support the crane jib during mast erection.
 
 

 


more news

We find a suitable solution
for every problem

Our competences
Hoisting technology
Industrial handling
Automation engineering
Material flow
Production resources